• Advertise with Banana Tree
  • Web Site Design
  • About Banana Tree News
65 °f
Glen Rock
69 ° Wed
69 ° Thu
68 ° Fri
68 ° Sat
Saturday, July 18, 2026
Banana Tree News
  • Borough Info.
  • GR Organizations
  • Senior Services
  • Event Calendar
  • Advertise with US
  • Candidates
No Result
View All Result
Banana Tree News
No Result
View All Result
Home Schools

Glen Rock School District to hold a Referendum Vote

by Julie Allen
November 26, 2024
0
SHARES
26
VIEWS
Share on FacebookShare on Twittershare via Email

Related posts

BOE Candidate: Dan Corey

Additional BOE Candidate questions: Dan Corey

November 26, 2024
BOE Candidate: Sivan Romascanu

Additional BOE Candidate questions-  Sivan Romascanu

November 26, 2024

The Glen Rock School District will hold a referendum vote for several projects on March 12, 2019. The referendum is for four projects around the district.

Auditorium Renovations at Central Elementary School

The renovation of Central’s auditorium will featuremuch needed safety and accessibility improvementsbut will keep the character and feel of the original theatre. The updated auditorium will free up much needed community space, alleviating congestion at the HS/MS auditorium, creating an additional venue for district events. The project will include:

  • Accessible chairlift to the stage
  • Handicap accessibility to the theatre making the room ADA compliant
  • Installation of acoustical improvements and a newsound system
  • New lighting, curtains and the addition of aisle lighting
  • Replacement of broken seating and refinishing of splintered flooring

Sports Field Repairs at Alexander Hamilton Elementary School

The reconditioning of the sports field at Hamilton Elementary School will benefit not only Hamiltonstudents but all the participants in the middle schoolsports and Glen Rock’s recreation programs that utilize Hamilton’s fields. The work will include:

  • Sodding the sports field and refinishing the tops of the ballfields for safety improvements to the playing surfaces
  • New irrigation system to replace non-working systems •ADA upgrades to the bleacher access and pathways
page1image23773952

HIGH SCHOOL – MIDDLE SCHOOL MEDIA CENTER

Media Center Renovations at Glen Rock High School and Middle School

 

The newly updated media center will be a flexible/ collaborative work space featuring a glass partition to allow middle and high school students to use the center simultaneously. The redesigned space will also feature one large flexible classroom which will consist of an adjustable partition allowing for two sectioned classrooms. With the look and feel of a college media center, the renovated room will offer students an open space where they can learn, socialize, and work on computers. Highlights of the project include:

  • Converting existing computer lab into a state-of-the-art television/broadcasting studio
  • A cutting-edge makerspace classroom, creating collaborative work spaces for learning and exploring
  • Moveable furniture that can be configured based onspace needs
  • Lighting upgrades
  • New storage area
  • Rooftop units (condensers for AC) replacements for improved indoor environment

Air Conditioning Upgrades at All Four Elementary Schools

In keeping with Glen Rock Board of Education strategic goals for the 2018/2019 school year, the referendum includes air conditioning (AC) installation at all four elementary schools in spaces where AC systems do not currently exist. The inclusion of AC supports district initiatives to enhance the safety, health and well-being of our staff and students. The AC install will contribute to the comfort of student and staff while supporting learning and teaching. The new AC will provide fresh air levels required by code, unlike window units which do not provide enough cooling to withstand humidity. The scope of the project will include but will not be limited to:

  • New condensers will be installed to provide cooling in all classrooms currently without AC
  • New metal shelving and chases will be installed asneeded
  • Existing ductwork to be modified as needed
  • Existing exhaust fans to be repaired/replaced asrequired
  • Electrical upgrades to support AC at Coleman
  • Two new boilers at Hamilton
  • New building management control system to be installed throughout all four elementary schools
  • New cassette units, heat pumps, etc. with modifications to rooftop units for integration with the building management control system

Voting on the referendum will beheld March 12, 2019 from 6am-8pm at your district polling location.

The total cost of the project is $14,718,320. Glen Rock is projected to receive $4,503,430 from the New Jersey Department of Education debt service aid reducing the taxpayers’ share of the bond project to $10,214,890.
The estimated tax impact on an average assessed home valued at $563,170 would be $14.60 a month on a 20-year bond or $18.09 on a 15-year bond.

Additional information is available on thedistrict’s website, www.glenrocknj.org. Residents can visit the site to learn more aboutcost, construction, project schedule, guidelines,and other details. An interactive Q&A isavailable to post questions that will be answered by the Glen Rock administration.

 

Here is the brochure with more information.
Previous Post

Students and Citizen of the Month at Glen Rock High School

Next Post

Glen Rock Police Blotter January 28th – February 3rd, 2019

Next Post
Weekly Police Blotter

Glen Rock Police Blotter January 28th - February 3rd, 2019

Comments 38

  1. Pingback: สล็อตเว็บตรง ลิขสิทธิ์แท้ จาก U.S.A
  2. Pingback: orcbet รวมสล็อตหลายค่าย
  3. Pingback: Pg333 เว็บเล่นสล็อตแจกเครดิตฟรี
  4. Pingback: pakong188
  5. Pingback: Lsm99pg
  6. Pingback: สล็อตแตกง่าย Happyluke
  7. Pingback: Aviator
  8. Pingback: mostbet indir
  9. Pingback: dark168
  10. Pingback: nzt989
  11. Pingback: Mostbet
  12. Pingback: Aviator
  13. Pingback: King Chance
  14. Pingback: Werewolf\'s Hunt
  15. Pingback: FORTUNE DRAGON
  16. Pingback: fortune mouse
  17. Pingback: ร้านดอกไม้
  18. Pingback: อัพเกรดไฟหน้ารถยนต์
  19. Pingback: ricky casino
  20. Pingback: ไก่ชนออนไลน์ LSM99 เรทราคาดี
  21. Pingback: fear of god essentials
  22. Pingback: นัดเด็ก
  23. Pingback: ระบบสมาชิก
  24. Pingback: 777
  25. Pingback: Chicken Road download
  26. Pingback: endolift
  27. Pingback: ชิปปิ้งจีน
  28. Pingback: mostbet aplikace
  29. Pingback: เหรียญรางวัล
  30. Pingback: นำเข้ามอเตอร์ โบลเวอร์
  31. Pingback: read article
  32. Pingback: หวยนาคา
  33. Pingback: เว็บหวย 42 Lotto
  34. وب سایت شوپی says:
    7 months ago

    برای فعالیت حرفه‌ای در بازار کار جهانی، اولین قدم عبور از سد تحریم‌ها و وریفای هویت است. تیم شوپی یک راهکار عالی برای این موضوع دارد و خدمات وریفای قانونی حساب‌های فریلنسری را با بالاترین کیفیت ارائه می‌دهد. با استفاده از مدارک معتبر شوپی، هویت شما در پلتفرم‌های خارجی به صورت دائمی تایید می‌شود و می‌توانید مثل یک شهروند جهانی پروژه بگیرید.

  35. وب سایت شوپی says:
    7 months ago

    برخلاف سرویس‌های واسطه، شوپی فرآیند احراز هویت را به‌صورت واقعی و با پشتیبانی گام‌به‌گام انجام می‌دهد. در خدمات احراز هویت بروکرهای فارکس از Shoopi تمامی مراحل از تهیه مدارک تا تایید نهایی حساب انجام می‌شود و نتیجه کار یک حساب تأییدشده و مادام‌العمر برای شماست.

  36. Adsnow says:
    7 months ago

    من سرویس‌های مختلفی رو برای آف-پیج تست کردم، ولی پکیج فروم ادزنو نسبت به قیمتش بازدهی عجیبی داشت. هم تعدادش خوبه (۵۰ تا)، هم دائمیه و هم اینکه گزارش کامل میدن. برای کسانی که می‌خوان با بودجه محدود سئوی خارجی‌شون رو تقویت کنن، بدون شک بهترین پکیج بک لینک فروم و انجمن رو ادزنو ارائه میده.

  37. وب سایت گرافیسو says:
    7 months ago

    گواهینامه‌هایی که از گرافیسو تهیه می‌کنید تفاوتی با نسخه رسمی کشور ندارند. من گواهینامه رانندگی بین‌المللی برای فرانسه گرفتم و ظاهرش دقیقاً مطابق نمونه واقعی بود؛ از لوگو و هولوگرام گرفته تا فونت و رنگ‌بندی کارت. واقعاً برای استفاده بین‌المللی عالیه.

  38. new lsm99 says:
    6 months ago

    Can you be more specific about the content of your article? After reading it, I still have some doubts. Hope you can help me. new lsm99.

Leave a Reply

Your email address will not be published. Required fields are marked *

RECOMMENDED NEWS

Seniors Lead the Way in Glen Rocks 35-7 win over Lodi

Seniors Lead the Way in Glen Rocks 35-7 win over Lodi

4 years ago
GR Dog Park Becoming a Reality

BOE canditate interview Sanjiv Ohri

10 years ago

Community Blood Drive this weekend

10 years ago
Rutherford hands Glen Rock its first loss of the season, 49-7

Glen Rock football plays Homecoming game tonight vs. North Arlington

4 years ago
Facebook Twitter Instagram LinkedIn
Banana Tree News

We are the one place for news around the Rock!

Follow us on social media:

Recent News

  • Jill Orlich and Maureen Rozanski Host Senior Breakfast, Engaging Glen Rock’s Senior Community
  • Additional BOE Candidate questions: Dan Corey
  • Additional BOE Candidate questions-  Sivan Romascanu

© 2024 News Around the Rock

No Result
View All Result
  • Home
  • Borough Info
  • Calendar of Events
  • Candidates
  • Senior Services
  • Web Site Design
  • Advertise With Us
  • Contact
  • Candidates

© 2024 News Around the Rock